    1 == SHARK-NIR Commissioning Activities List ==
     1== SHARK-NIR Commissioning Plan ==
    22
    33This is an evolving page and the lists and activities will evolve in time as we gain more and more experience.
     
    3232||Nighttime testing for performance||C6||
    3333
    34 == Phase 1 ==
     34== Naming structure of the commissioning activity ==
     35Each commissioning test/activity has a unified structure as follows:
     36
     37**Name of the commissioning activity**
     38 - **phase**: comes in which phase of the commissioning (1/2/3)
     39 - **status**: Reports the current status of the test (draft, final, complete)
     40 - **category**: one of the categories mentioned above
     41 - **recurrence**: Describes how frequently the test must be executed
     42 - **duration**: Estimates the time required to complete the test
     43**Description**
     44•       Contains a general description of the test
     45**Prerequisites**
     46•       Lists items that must be in place before the test begins
     47**Procedure**
     48•       Explains in detail how to execute the test
     49**Success Criteria**
     50•       Enumerates the outcome associates with successful completion of the test
     51**Notes**
     52•       Additional supporting information
     53**LBTO Support**
     54•       Mention if (and what) support required from LBTO
     55**Associated SHARK-NIR personnel**
     56•       Mentions here who are the associated personnel to the test
     57**Date performed and by whom**
     58•       Mentions who performed the test and when
     59
     60== Commissioning Activity ==
     61In this section, you can see all the commissioning activities listed in chronological order. If you click the individual activity, you can see more details of it.
     62
     63=== Phase 1 ===
    3564'''SHARK-NIR Location''' : LBT mountain bay and clean room
    3665||'''Number'''||'''Activity Name'''||'''Day / Night'''||'''Duration (mins)'''||'''Maximum Duration (mins)'''||'''Category'''||'''LBTO Support'''||                     
     
    4574||P1.9||Science detector calibrations||Day||60||60||C1||-||
    4675
    47 == Phase 2 ==
     76=== Phase 2 ===
    4877'''SHARK-NIR Location''' : LBT platform
    4978||'''Number'''||'''Activity Name'''||'''Day / Night'''||'''Duration (mins)'''||'''Maximum Duration (mins)'''||'''Category'''||'''LBTO Support'''||     
     
    5887||P2.9||Nighttime acquisition and setting telescope collimation for night||Night||180||180||C4||Support from LBTI for AO running||
    5988
    60 == Phase 3 ==
     89=== Phase 3 ===
    6190'''SHARK-NIR Location''' : LBT platform
    6291||'''Number'''||'''Activity Name'''||'''Day / Night'''||'''Duration (mins)'''||'''Maximum Duration (mins)'''||'''Category'''||'''LBTO Support'''||